Free Shipping over $250 within USA & Canada
Free Shipping over $250 within USA & Canada
CAD $0.00 – CAD $1.00
Please message all changes first and use this to communicate the changes to avoid mix ups.
UPDATE: If your change request requires a charge you can add pricing as needed. If you need to add $50 for instance then do quantity $1 x 50.
Usually there is no charge, but for instance you meant to order long and ordered standard inseam. You add the price difference here and put the note. Please make sure we know what is happening through as we have to pause cutting etc.
Ordered something and hope it isn’t cut yet and really want to make a change?
Examples:
Message Stephanie Gross or Bumby (who is still Stephanie) or email if you aren’t on FB
We can not guarantee that changes will be made.
We will try.
All orders are placed as though they are final.
Only logged in customers who have purchased this product may leave a review.
Ask a question
Your question will be answered by a store representative or other customers.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Thank you for the question!
Your question has been received and will be answered soon. Please do not submit the same question again.
Error
An error occurred when saving your question. Please report it to the website administrator. Additional information:
Add an answer
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Thank you for the answer!
Your answer has been received and will be published soon. Please do not submit the same answer again.
Error
An error occurred when saving your answer. Please report it to the website administrator. Additional information:
Great for sweaters & bottoms for all ages. A cloth diaper cover functional weight
Great for tops, tanks and dresses. The Dreamweight is also available for bottoms as well.
Machine wash wool?
Doesn’t that sound like a dream? Well lets make it a reality. We have partnered with Unicorn Laundry Care products because they are the best product I have found for our wool. Find a retailer near you or in our shop.
Our wool is thick and soft and likes to hold fluid. Which means it will hold onto soap and detergent unless it is rinsed and washed well. So we highly recommend using not only very little soap, but also to rinse well.
Unicorn Beyond Soft in a natural Fabric Conditioner. It helps keeps the fibers soft and healthy.
Step 1 Dissolve 1 TBSP of Unicorn Beyond Clean in some water
Step 2 Add wool to your washing machine
Step 3 Add dissolved detergent to the dispenser
Step 4 Turn on washer to Cool setting (use wool setting or lower spin)
Do a secondary rinse cycle, aka rinse and spin with pre-dissolved Beyond Soft Conditioner.
We also recommend doing this every so often to refresh your wool between washes. It removed light soiling and neutralized salts
Wool has been used for centuries in all climates. It keeps you warm in the winter and cool in the heat. Reducing night sweats and rashes
Wool is a naturally breathable fiber reducing rashes and keeping baby dry.
Our in-house proprietary dyeing process not only gives us stunning colours but also pre-treats the wool making it machine washable.
We had craft every item in our workshop. Each item is lovingly cut and sewn by our team. We appreciate your business and love doing what we do.
Wool sops up humidy and moisture and it also repells it. Its called a miracle fiber by many. The lanolin helps the wool repel fluids back to the diaper, then as it becomes too much it absorbs a tremendous amount before feeling damp.
Our stuff is adorable. It really is. Come join our Flock and you can see all of the custom made items we have made over the years. Our brand is more than clothing, its about family.
Machine wash wool?
Doesn’t that sound like a dream? Well lets make it a reality. We have partnered with Unicorn Laundry Care products because they are the best product I have found for our wool. Find a retailer near you or in our shop.
Our wool is thick and soft and likes to hold fluid. Which means it will hold onto soap and detergent unless it is rinsed and washed well. So we highly recommend using not only very little soap, but also to rinse well.
Unicorn Beyond Soft in a natural Fabric Conditioner. It helps keeps the fibers soft and healthy.
Step 1 Dissolve 1 TBSP of Unicorn Beyond Clean in some water
Step 2 Add wool to your washing machine
Step 3 Add dissolved detergent to the dispenser
Step 4 Turn on washer to Cool setting (use wool setting or lower spin)
Do a secondary rinse cycle, aka rinse and spin with pre-dissolved Beyond Soft Conditioner.
We also recommend doing this every so often to refresh your wool between washes. It removed light soiling and neutralized salts
Why Use Lanolin?
Lanolin is a naturally occurring wax found in wool fiber. It is cleaned out of the wool during processing the fibers for fabric and yarn. We only use the purest pharmaceutical grade lanolin. Lanolin conditions the wool fibers and gives the waterproof protection we love about wool. Lanolin also increases the wool’s anti-bacterial properties to help your diaper cover self-clean between uses and naturalize urine.
Use our Emulsion Blocks to create a lanolin rich bath to reintroduce this amazing natural goodness into your wool. Click the rest of the tabs for more information on how to use them.
You can also use our pre-emulsified Ready to Use Lanolin Blend to make it even easier! Made with all natural ingredients to take away the guesswork. Super rich, with at least 25% lanolin in the mixture.
Want something for on the go or between washing. Use our pre-mixed Lanolin Rich Spray. Helps boost the wool performance without the wait.
Lanolin is a naturally occurring wax found in wool fiber. It is cleaned out of the wool during processing the fibers for fabric and yarn. We only use the purest pharmaceutical grade lanolin. Lanolin conditions the wool fibers and gives the waterproof protection we love about wool. Lanolin also increases the wool’s anti-bacterial properties to help your diaper cover self-clean between uses and naturalize urine.
Use our Emulsion Blocks to create a lanolin rich bath to reintroduce this amazing natural goodness into your wool. Click the rest of the tabs for more information on how to use them.
You can also use our pre-emulsified Ready to Use Lanolin Blend to make it even easier! Made with all natural ingredients to take away the guesswork. Super rich, with at least 25% lanolin in the mixture.
Want something for on the go or between washing. Use our pre-mixed Lanolin Rich Spray. Helps boost the wool performance without the wait.
Basic Steps
Let’s Create Together
caytlin (verified owner) –
Genvieve (verified owner) –
Allison (verified owner) –
CAELYN (verified owner) –
Steph is always awesome and quick to find an easy way to streamline. I am greatful for her reaching out when I made a mistake in my purchase.
Berlanda Siltman (verified owner) –
Haven’t received product yet
Moriah S. (verified owner) –
Haley Personna (verified owner) –
Lanae McQuillin (verified owner) –
Stephanie was AMAZING in helping me out with changing my original order. It was all my fault but she went out of her way to make my item perfect.